Solar Panel Installation in Fort Lauderdale, FL

Solar panels last 25 years or more, so the roof under them has to last at least that long. For solar panel installation in Fort Lauderdale, APEX Roofing of Delray Beach checks the roof first, replaces it when it will not outlast the panels, and installs panels, inverters, and batteries with a local solar company we partner with, with the permits handled for you.

Solar panels being installed on a new standing seam metal roof in Fort Lauderdale, service area for APEX Roofing of Delray Beach

Why the Roof Comes First

The Half Life Rule

If your roof is past about half of its expected life, replacing it before the panels go on usually makes sense.

The 5 to 7 Year Rule

If the roof will need replacing in the next 5 to 7 years, do it now rather than work around new panels later.

Panels Are Costly to Move

Taking panels off and putting them back for a later reroof adds a real cost that doing the roof first avoids.

One Project, Better Price

When the roof and solar are done together, we can offer a better price than two separate jobs.

What a Solar Installation With APEX Includes

Everything from the roof check to the final inspection, with the roof and the solar planned as one job.

Who Does What

APEX: the free roof inspection, any roof repair or replacement, the permits, and the project from start to finish.

Our solar partner: a local solar company we work with installs the panels, inverters, batteries, and electrical work.

One company manages the project, and the roof under your panels is done by a licensed roofer.

Paying for Solar in Fort Lauderdale in 2026

The rules changed at the start of 2026. Here is what still helps and what does not.

The 30% Federal Credit Ended

The federal residential clean energy credit, which paid back 30% of the cost of a system a homeowner bought, ended for systems after December 31, 2025. Be careful with any quote that still counts it.

Florida Tax Breaks Still Apply

Florida does not charge sales tax on solar energy equipment, and the value solar adds to a home is not counted when your property is assessed for taxes.

Financing

Most homeowners finance solar. A local bank or credit union is often the best place to start, and some lenders specialize in solar. For the roof, see our financing options.

General information, not tax or financial advice. Ask a tax professional how these rules apply to you.

How a Solar Project Runs With APEX

From the first roof check to switching the system on, most projects take about 2 to 3 months, much of it permits and approvals.

1

Free Roof Inspection

We check the roof and tell you if it will outlast the panels or should be replaced first.

2

Design and Quote

Panels, inverter, any battery, and the price in writing, with any roof work quoted alongside.

3

Roof Work

If the roof needs it, the repair or replacement is done before any panel goes on.

4

Permits

We handle the permits and inspections, which take up much of the 2 to 3 months.

5

Installation

Panels, inverters, and any batteries are installed with our solar partner, and the system is inspected.

What Homeowners Are Saying About APEX

Real reviews from homeowners across Broward and Palm Beach counties.

We serve homeowners across Fort Lauderdale, including Bermuda Riviera, Coral Ridge, Coral Ridge Isles, Imperial Point, Galt Mile, and Palm Aire Village.

Solar FAQs for Fort Lauderdale Homeowners

Should I replace my roof before I add solar?

If the roof is past about half of its expected life, or will need replacing in the next 5 to 7 years, yes. Removing and reinstalling panels later is expensive, and we can offer a better price when the roof and solar are done together. See our roof replacement page for roof prices.

Not for a system a homeowner buys. The federal residential clean energy credit ended for systems after December 31, 2025. This is general information, not tax advice.

Plan on about 2 to 3 months from start to finish. Most of that time is permits, inspections, and approvals rather than work on your roof.

Yes. Battery storage can be added to the system so you have backup power when the grid goes down, which many Fort Lauderdale homeowners want during hurricane season.

Yes. Standing seam metal is one of the easiest roofs for solar, since mounts clamp to the seams without drilling through the panels. See our metal roofing page.

Under Florida law, the value solar adds to a home is not counted when your property is assessed. Ask your county property appraiser how it applies to your home. A roof inspection is the first step in planning a system.

Plan Solar for Your Fort Lauderdale Home, Starting With the Roof

A free roof inspection, a written quote for the solar and any roof work, and permits handled for you.